Minneapolis Fire Station 14

Location(s)

Fire Station 14
1704 33rd Ave N
Minneapolis, MN, 55412
See map: Google Maps
Green Roof Tech Specs
Depth of Growing Medium:
4 inches
Growing Medium:
Lightweight blend of organic and inorganic materials
Insulation (inches):
4
Green Roof
Green Roof Year Built:
2006
Status:
Completed
Description:

Green roof on a new fire station apparatus bay consisting of 2’ x 4’ GreenGrid plan modules set on a standard single ply roof with a slip sheet. System is 4” deep and planted with two species of sedum.

Square Feet:
2840
Type:
Extensive
Membrane:
standard single ply roofing membrane
Project Cost:
44000
Growing Medium Source:

Weston Solutions, Inc.

Maintenance Requirements:

Monthly site visits, watering and weeding during the growing season for the first two years and then every three months during the growing season thereafter. Watering and hand weeding as needed.

Plant List:

Sedum Album “Coral Carpet”
Sedum Spruri “John Creech”

Green Roof Installers
General Installer:
Weston Solutions
Building
Building - Year Built:
2005
Building Architect:

Ankeny Kell Architects, P.A.

Landscape Architect:

Melchert Walkky

Structural Engineer:
Palanisami & Associates, Inc.
Owner Info
Owner Name:

City of Minneapolis